Aeroponic Unit V1.1
User Rating: / 193
PoorBest 
Article Index
Aeroponic Unit V1.1
Items Needed
Tools needed
The Lid
Water Level Indicator
Plumbing
Testing
Final Assymbly
Finishing Up



Final Assymbly:

Weather Strip the Containers Edge. Run the weather striping around the rim of the container; be sure to clean the lid first to assure a good fit. This step is to prevent overspray from dripping down the sides of the unit.



Modify the reservoir by cutting slots in the side and the lid to allow for a place to run the power cord.



Secure the lid down with the spring clamps.



Insert your Net pots and Neoprene collars. Also this is a good time to pull out that Sharpie and mark your water level on the clear tube.




Next, Finishing Up--->